| "We wish to compliment you on the excellent report rendered for the subject plant. The existing and additional new facilities were clearly presented. The breadth of data developed was extensive. And finally, the over-all organization and presentation of data was both practical and attractive. Many thanks."
Leo Fyer, Sr. E.E.
Alvarado Water Filtration Plant |
|
|
|
 |
 |
University of Washington Electrical Engineering Building
|
| Phase 1 of the new Electrical Engineering/Computer Science and Engineering building at the University of Washington was completed in the fall of 1997.
Power is supplied to the facility from the campus 13.8 KV primary feeder system. This then feeds a low voltage distribution system consisting of three substations, each with a 4000 Amp switchboard. Emergency power is provided via a 1200 Amp switchboard.
|
 |
| Project Information |
| Study Performed |
Short Circuit & Protective Device Coordination |
| # of nodes |
393 |
| Devices plotted |
47 |
| Time current sheets created |
11 |
|