P
Home Services Portfolio Resources Corporate Contact
roject Resulst
Portfolio
"We wish to compliment you on the excellent report rendered for the subject plant. The existing and additional new facilities were clearly presented. The breadth of data developed was extensive. And finally, the over-all organization and presentation of data was both practical and attractive. Many thanks."

Leo Fyer, Sr. E.E.
Alvarado Water Filtration Plan
t


Seattle Office
16122 SE 266th Street
Covington, WA 98042
(253) 639-8535 P.
(253) 639-8685 F.
Fuhr@PowerStudies.com

San Francisco Office
2400 Third Street
San Francisco, CA 94107
(415) 828-0529
Tran@PowerStudies.com

Schnitzer Steel Industries
Schnitzer Steel Industries is in the business of recycling metal. Recently, Schnitzer Steel's average facility power factor was 85% lagging. This resulted in a large monthly power factor penalty charge. Contributing to the low power factor was a newly added 7,000HP shredder with a large number of smaller induction motors.

Schnitzer Steel hired PowerStudies.com to perform a power factor correction analysis to improve the facility power factor and eliminate the power factor penalty charge. There were three existing power factor correction capacitor banks. PowerStudies.com made two site visits and found that one of the banks (1,200kVAR) was not being used. PowerStudies.com recommended that this bank be brought on line. Subsequent to PowerStudies.com 's analysis, the power factor at Schnitzer Steel increased to 97-98%.



Project Information
Study Performed Power Factor Correction
Project Results Power factor went from an average of 85% to above 95% 