University
of
Washington
Electrical
Engineering
Building
|
|
Phase 1 of the new Electrical
Engineering/Computer Science and Engineering building at the
University
of
Washington
was
completed in the fall of 1997.
Power is supplied to the facility from the campus 13.8 KV
primary feeder system. This then feeds a low voltage
distribution system consisting of three substations, each
with a 4000 Amp switchboard. Emergency power is provided via
a 1200 Amp switchboard.
|
 |
 |
Project Information |
 |
| |
Study performed |
Short circuit and Protective device coordination
|
|
|
|
Number of nodes
|
393
|
|
| |
Devices plotted |
47
|
|
| |
Time current sheets
created |
11
|
|
 |
|
 |
|
| University
of
Washington
Fisheries
Building
|
|
The
College
of
Ocean
and Fishery Sciences – involved in teaching and
research – is one of the largest institutions of
its kind in the nation. The University of Washington
School of Fisheries is constructing a new
Fisheries
Building
on
their main campus.
Power is supplied to the facility from the campus
13.8 KV primary feeder system. This then feeds a low
voltage distribution system consisting of several
substations. The building also contains an emergency
power switchboard and distribution system.
|
 |
 |
Project Information |
 |
| |
Study performed |
Short circuit and Protective device coordination
|
|
|
|
Number of nodes
|
103
|
|
| |
Devices plotted |
27
|
|
| |
Time current sheets created |
7
|
|
 |
|
 |
|
|
|
| University
of
Washington
Oceanography
Building
|
|
The
College
of
Ocean
and Fishery Sciences – involved in teaching and
research – is one of the largest institutions of
its kind in the nation. The University of Washington
School of Fisheries is constructing a new
Fisheries
Building
on
their main campus.
Power is supplied to the facility from the campus
13.8 KV primary feeder system. This then feeds a low
voltage distribution system consisting of several
substations. The building also contains an emergency
power switchboard and distribution system.
|
 |
 |
Project Information |
 |
| |
Study performed |
Short circuit and Protective device coordination
|
|
|
|
Number of nodes
|
137
|
|
| |
Devices plotted |
48
|
|
| |
Time current sheets created |
13
|
|
 |
|
 |
|
|
|
|
|
 |